T35 Sprint review and release notes

Sprint review and release notes

A software team at a sprint review with a mobile app on devices

Northstar mobile, Sprint 2026.09 2 shipped 2 blocked on you Client-ready

What Ironleaf Software shipped this sprint for Northstar's mobile app, what slipped and why, and what we need from you before the next sprint starts. Prepared by Leo Hart, Technical Lead, for Ruth Okafor, Product Owner at Northstar.

Sprint details
ProductNorthstar mobile
Sprint2026.09, Sep 8 to Sep 19, 2026
Dev team leadLeo Hart, Ironleaf Software
Client product ownerRuth Okafor, Northstar
Target release2026.09
Sprint review callMonday, Sep 22, 2026, 10:00

Sample template: the firm, people, clients and figures are fictional, and the embedded view holds synthetic sample records.

Live example from the Dashboards app, shown with Cedar & Stone's demo data.

Engineering board

Cards below are grouped by status across every Ironleaf client currently in this pipeline, from Ready through Blocked. Look for the cards under Client or product = Northstar mobile; anything in Blocked cannot move until the dependency clears, and two of this sprint's blockers need a decision from you.

Before you share this page with a client

This board holds work items for every Ironleaf client, not only Northstar. Before sharing this sprint review, switch the embed to a saved view filtered to Northstar mobile, or duplicate the page and filter it first.

Sprint timeline

gantt
    title Northstar mobile, Sprint 2026.09
    dateFormat YYYY-MM-DD
    section Shipped
    Monthly maintenance window :done, 2026-09-08, 2026-09-12
    Notification opt in timing :done, 2026-09-10, 2026-09-17
    section In progress
    Large photo upload crash :active, 2026-09-15, 2026-09-26
    section Blocked
    Legacy SDK upgrade :crit, 2026-09-08, 2026-09-19
    Offline edit conflict :crit, 2026-09-08, 2026-09-19
Shipped this sprint

What shipped

Work itemTypeEstimateAcceptance criteriaEvidence
Monthly maintenance windowSupport3All smoke tests pass after updateshttps://git.example/northstar/mobile/releases/2026.09
Notification opt-in timingFeature3Permission prompt appears only after the first completed orderhttps://git.example/northstar/mobile/releases/2026.09.1

Both items were validated and accepted by Ruth Okafor before release.

Release notes

Northstar Mobile 2026.09
- Support: applied September OS and dependency updates. All smoke tests
  passed in staging and production before release.

Northstar Mobile 2026.09.1
- Feature: notification permission is now requested after a customer's
  first completed order, instead of at install. We expect this to
  reduce permission denials based on early field feedback; a full
  sprint of data is not yet available to confirm the effect.
What slipped

Two items blocked, both need a decision from Northstar

Legacy SDK upgrade (target 2026.11) is blocked because the vendor sandbox credentials needed to test the new payments SDK have not been issued by Northstar's vendor contact. Offline edit conflict (target was 2026.09, missed) is blocked because Northstar has not decided which record should win when an offline edit conflicts with a newer server record; the product decision has been pending since Sep 11. Owner on our side: Leo Hart. What we need: the sandbox credentials and a decision on the conflict rule, both this week, or both items slip to the 2026.11 release.

Sprint items completed
40%

Two of the five items planned for this sprint shipped. Large photo upload crash is in development and on track for 2026.10; the two blocked items above are the reason the sprint did not close at four of five.

Next sprint

✓Sprint 2026.09 review
Northstar provides sandbox credentials and conflict decision
Sprint 2026.10 planning
Large photo upload crash ships
Before Sprint 2026.10 planning
Northstar issues vendor sandbox credentials for the SDK upgrade
Northstar confirms the offline conflict resolution rule
Ironleaf finishes the large photo upload fix for 2026.10
✓Sprint 2026.09 release notes sent to Northstar's support team
How to use this template

Duplicate this page once per client per sprint. Replace these values; if a required value is missing, show Needs review instead of guessing.

VariableMeaningRequired
{{client.product_name}}Client product the sprint coversRequired
{{sprint.number_and_dates}}Sprint identifier and date rangeRequired
{{team.lead_name}}Dev team lead who owns the reviewRequired
{{item.shipped_summary}}Work items shipped this sprint, with acceptance criteria and evidenceRequired
{{item.blocked_reason}}Reason and owner for each blocked itemRequired when an item is Blocked
{{sprint.next_planning_date}}Date of the next sprint planning sessionOptional

Before sharing: confirm the embedded board is filtered to this client only.