FuseBase Demo Organization
Copy to my workspace

T27 Maintenance retainer monthly report

Maintenance retainer monthly report

A web delivery lead checking a professional services website on desktop and phone

September 2026 6 of 6 links fixed 1 investigation open Client: Cedar & Stone

What Brightframe delivered under Cedar & Stone's website care plan in September: the care review, the accepted build and the work still open on the site we maintain. Prepared by the web delivery lead for the client's marketing lead.

Broken campaign links fixed6of 6 found in the care review
UAT tests passed, build 2811of 11, accepted Sep 10
Open investigations1degraded form response
Launch content gaps supplied1of 3, two FAQs with service leads

What the care plan covers

The care plan covers monitoring, fixes, accessibility work and small content changes on the existing site. New features, such as the proposed calculator, are scoped as separate changes so their cost stays visible and planned care work is not delayed.

Report details
ClientCedar & Stone, professional services firm
SiteCedar & Stone managed website and consultation form
Web delivery leadTheo Clark, Brightframe
Client partnerAda Rivers, Brightframe
Acceptance ownerSimon Lee, Marketing Lead, Cedar & Stone
PeriodSep 1 to Sep 30, 2026

Sample template: the firm, people, clients and figures are fictional and shown for illustration only.

Care and launch checks

Links and acceptance are complete. Launch content is the open item: one of three gaps is supplied and the two service FAQs are with Cedar & Stone's service leads.

Work by category

CategoryThis monthNotes
Care review6 links fixed, 1 form issue openHosting logs needed before severity is confirmed
Acceptance testingBuild 28, 11 of 11 passedSame script as build 27, which passed 9 of 11
Launch content5 pages ready, 1 of 3 gaps suppliedNo placeholder copy goes live
Change requestsCalculator moved to a separate changeDiscovery accepted Aug 20; the care plan stays as agreed
What shipped

Releases and work in progress

  • Sep 10: Build 28 accepted. On build 27, the mobile form confirmation and one keyboard path failed; Theo consolidated the feedback that had arrived against two builds, and build 28 passed the same script with Simon's explicit acceptance.
  • Sep 18: Care review completed. 6 broken campaign links fixed; 1 degraded form response under investigation.
  • Oct 2 (planned): Form retest.
  • Oct 6 (planned): Final page check before the launch pages go live.

Risks and issues

One form response is degraded

The care review found a degraded response on the consultation form. Cause: not yet confirmed; hosting logs are needed before we can judge its severity. We recommend keeping the incident open until a successful retest on Oct 2. If closed early, a real fault could keep affecting consultation requests without anyone watching for it.

Launch pages wait for two FAQs

Five launch pages are ready, but two service FAQs are still missing. Owner: Cedar & Stone's service leads, assigned by Simon. Target: before the Oct 6 final page check. The pages do not go live with placeholder copy.

Recommendations for October

Proposed October priorities
Retest the consultation form and close the incident only after it passes
Recheck the final pages against the approved source set on Oct 6
Confirm scope and acceptance criteria for the calculator in discovery
Link build 28 and its evidence to the release notes
✓September care review walked through with Simon Lee

Site health this month

SignalTargetSeptember resultStatus
Broken campaign linksNone open6 found, 6 fixedOn target
Consultation form responseHealthy1 degraded response, under investigationOff target
Acceptance scriptAll tests pass11 of 11 on build 28On target
Launch contentNo placeholders2 FAQs outstandingWatch

Having the calculator split out as its own change made the care plan easy to explain internally. I can see what is maintenance and what is new work.

Simon LeeMarketing Lead, Cedar & Stone, fictional

Next review

TCTheo ClarkWeb Delivery Lead, Brightframe
SLSimon LeeMarketing Lead, Cedar & Stone

Next monthly report: Friday, Oct 30, 2026. The October report will confirm the form retest result and whether the launch pages went live.

How to use this template

Duplicate this page once per client and month. Replace the values below; if a required value is missing, write Unavailable next to the metric rather than estimating it.

VariableMeaningRequired
{{client.name}}Client the care plan coversRequired
{{care.review_findings}}Issues found and fixed in the monthly care reviewRequired
{{acceptance.result}}Latest build tested and its acceptance resultRequired
{{scope.change_requests}}Requests moved to separate changes, with statusOptional
{{risk.description}}Any open risk, with cause, recommendation and consequenceOptional
{{next.review_date}}Date of the next monthly reportRequired

The live checklist and roadmap come from the Dashboards app for this client. Close an incident only after a successful retest, never on the assumption that a fix worked.